Now What?

The Town of Sandwich just took another kick to the groin this week.

Two hundred pound windowsills began falling from a 15 year old school building necessitating $500,000 in repair work.  Engineering report says $500,000 to fix -- including sealing windows.  I guess we found out what happens when you wait 15 years to re-seal a window that needed to be re-done every 5 years!

While you're at it, can you throw another $150,000 on the tab for some school reno work?

The $30,000 re-grouting which had been discussed and delayed for several years finally shut-down the pool last year  when the water drained out of the pool during a power outage.  (Don't ask about the emergency generator!)   The engineer came back with a report stating that, in addition to re-grouting to stop the leak, the pool also required a new HVAC system.  But, no problem -- nothing that $980,000 won't fix. 

And then Justice Muse issued a ruling that echoed exactly what many people have been saying 